Product / CPMS

The operator's
command centre.
OCPP at the bottom.
Outcomes at the top.

The MobiFLO CPMS runs your chargers, tariffs, energy rules, and Lite operator workflows today. Broader Pro modules such as Hubject/OICP, Plug & Charge, enterprise integrations, and reseller payout are available only after partner onboarding or Pro deployment.

Protocols

Speaks every charger you'll buy this decade.

OCPP 1.6J and 2.0.1 are the deployed Lite protocol targets. OCPP 2.1 and ISO 15118 Plug & Charge via Hubject are roadmap/partner-dependent and are not claimed as live in Lite.

One protocol stack. Every hardware vendor.

We don't sell hardware. The current production-testing rule is to trust observed OCPP traffic: physical connector counts come from StatusNotification, and command support is verified from gateway logs.

  • ✓
    OCPP 1.6J and 2.0.1. Core command path, smart-charging commands, reservations, diagnostics, and simulator-verified AFIR display-message support for OCPP 2.0.1.
  • ✓
    OCPP 2.1 and Plug & Charge are roadmap/partner-dependent, not part of the current Lite live claim.
  • ✓
    Live wire-level diagnostics — see every CALL and CALLRESULT in the dashboard, replay, export.
  • ✓
    Production-testing diagnostics show observed connectors, recent OCPP messages, and command results before claiming charger support.
OCPP 2.0.1 · charger #4-A · live ● connected
14:08:01←BootNotification { model: "Terra 184", serial: "ABB-184-42A" }
14:08:01→BootNotification.conf { status: "Accepted", interval: 300 }
14:08:14←StatusNotification { connector: 1, status: "Available" }
14:09:22←Authorize { idTag: "NL-MOB-08821" }
14:09:22→Authorize.conf { status: "Accepted" }
14:09:24←StartTransaction { meter: 12482, connector: 1 }
14:09:24→SetChargingProfile { limit: 120kW, until: 14:34 }
14:09:30←MeterValues { power: 74kW, soc: 64% }
14:10:00←MeterValues { power: 118kW, soc: 66% }
SUPPORTED VERSIONS
2
OCPP 1.6J · 2.0.1 live target; OCPP 2.1 roadmap.
VENDOR MODEL
Open
Hardware-agnostic; verify each charger by observed OCPP traffic.
TESTING RULE
Live
Diagnostics and command metadata separate charger gaps from backend gaps.
PROD UPTIME
99.96%
Trailing 90 days. Status page open to the public.
Smart charging

Four DLM tiers. One engine.
Up to 50% less grid-tie cost.

Dynamic load management at four nested levels — site, transformer, building, grid. Cut your grid connection by half. Stop tripping breakers on Monday mornings.

TIER 1 · SITE

Charger ↔ charger

Balance load across chargers at one site. The cheap one to get right.

320 / 350 kW92%
TIER 2 · TRANSFORMER

Site ↔ feeder

Don't exceed the transformer behind the meter. Aware of phase imbalance.

620 / 800 kVA78%
TIER 3 · BUILDING

EV ↔ building load

Share the connection with HVAC, lifts, ovens. Real-time from the building meter.

410 / 650 kW63%
TIER 4 · GRID

Site ↔ grid signal

Lite DLM is wired for OCPP smart-charging control, scheduled caps, congestion override, and deployed simulator setpoint delivery; real hardware, DSO signals, and day-ahead market behavior are Pro validation items.

180 / 440 kW41% (curtailed)

An engine, not a configuration.

DLM isn't a checkbox on a feature matrix. It's the difference between a charger that trips your breaker and a charger that lives within whatever capacity you've got. We're proud of this one.

  • ✓
    Phase-aware: balance L1, L2, L3 within the same site
  • ✓
    SoC-aware: prioritise the car that's almost full to free a stall
  • ✓
    Tariff-aware: throttle during peak, accelerate during cheap windows
  • ✓
    Grid-aware extensions are Pro validation items until DSO signal ingestion is smoke-tested.
  • ✓
    Override-aware: emergency vehicles always get max power
LIVE · DEPOT M4 · 14:08 CEST
800 kVA ceiling DSO event 09:40 06:00 10:00 14:00
Tariffs & payouts

Price like an energy company.
Settle like a payments company.

Tariffs and receipt PDFs are implemented on the Lite path. Payouts, multi-PSP routing, and VAT/settlement automation depend on PSP configuration and deployed-path smoke.

Weekday tariff · CityPark Ede · DC fast
v4 · auto-applied for OCPI partners
Live
06–08
Low
€0.32 / kWh Off-peak
08–17
Peak
€0.58 / kWh Peak
17–19
Super-peak
€0.72 / kWh Super-peak
19–23
Mid
€0.42 / kWh Mid
23–06
Cheap
€0.21 / kWh Night

Visual editor.
Programmable underneath.

Drag to set windows. Layer time × connector × user. Test against a session log before going live. Publish to your roaming partners with one click — OCPI tariff updates auto-pushed.

  • ✓
    Multi-axis: time × connector × user group × site × roaming partner
  • ✓
    OCPI 2.2.1 tariff sync, both directions
  • ✓
    VAT-split invoices for B2C and B2B drivers, per market
  • ✓
    Stripe/PSP payouts are partner-dependent until KYC and preauth/capture/refund smoke tests pass.
  • ✓
    Voucher codes & corporate accounts with credit limits
Roaming

OCPI 2.2.1, both directions.
No walled garden.

OCPI is packaged into the Lite stack. Hubject/OICP is now in bridge-foundation work with readiness reporting and EVSE-status preview; Gireve, eMI3, OICP certification, and HFS settlement remain partner-dependent Pro integrations.

YOUR CHARGERS

Home network

Your CPMS, your tariffs, your sites. Full CPO control from a single dashboard.

OCPI HUB

Open routing

Direct OCPI 2.2.1 peering. Hubject/OICP readiness is visible in Lite; production hub reach still depends on partner onboarding.

DRIVER

Their wallet

Any roaming partner's driver pays through their own app, lands at your charger, you get paid.

✓
Roaming reach depends on OCPI partner onboarding; do not publish network-size claims until smoke-tested.
✓
Settlement and payouts are PSP/partner-dependent until KYC and payout smoke pass.
✓
OCPI 2.2.1 direct peering is the first validation path.
Operate

Less alert fatigue. More cars charging.

The day-to-day operator surface. Alerts that diagnose themselves. Tickets that route to the right team. A status page your drivers can actually read.

Diagnostics, not just alerts.

Every alert comes with what the charger said, what the meter said, what the user did, and a suggested first action — written by a real-life human, not a fault-code lookup table.

  • ✓
    Auto-grouped incidents: 12 faulted chargers in one block = one ticket, not twelve
  • ✓
    On-call rotations with PagerDuty, Opsgenie, Slack handoff
  • ✓
    Field-engineer mobile view with directions, charger photo, last 5 events
  • ✓
    Public status page per network — drivers see what you see
Incidents 3 open
Auto-grouped · 14:08
12 chargers faulted · Depot Noord
StatusNotification: Faulted · error E-B9
Critical Unassigned
2 min ago
Charger unreachable · CH-0482
Heartbeat timeout · last seen 09:44
Warning Field eng. notified
28 min ago
Transformer at 97% · Site Hofplein
DLM congestion override active · cap 180 kW
Warning Auto-mitigated
1 hr ago
Integrations

Built like a B2B SaaS, not an EV-charging silo.

REST APIs and webhooks exist in the platform. SAML/OIDC, SCIM, CRM/ERP, PMS, and finance integrations are enterprise/Pro integrations, not live Lite defaults.

IDENTITY
SAML · OIDC · SCIM
Azure AD · Okta · Google · Auth0
CRM & ERP
Salesforce · SAP · NetSuite
Bi-directional sync · pre-built objects
DATA
Webhooks · S3 · Snowflake
Daily exports · real-time event stream
OPS
PagerDuty · Opsgenie · Slack
Alerts route to your existing rotation
PAYMENTS
Stripe / PSP adapters
Stripe, Adyen, Mollie and more
ROAMING
OCPI direct first
Hubject, Gireve and eMI3 hubs available
ENERGY
DLM controls
Scheduled caps live; DSO signals are Pro items
PARKING
PMS / ANPR / barriers
Pro integrations, not Lite defaults
How we compare

An honest comparison.

Most CPMS choices come down to a handful of capabilities. This is where we differ. Provisional — verify before publishing.

Capability
MobiFLO
Driivz
GreenFlux
eMSP / driver app
✓ white-label, included
add-on
add-on
No-app guest pay
wired; PSP smoke pending
app-first
app-first
Smart DLM (grid-adaptive + scheduled)
scheduled live; simulator setpoint verified
site only
2 levels
Time-to-production
1–2 weeks
3–6 months
2–4 months
Per-charger pricing lock-in
✓ usage-based, no lock-in
per-charger contract
per-charger contract
Reseller commission
Pro programme
case by case
—
See it live

Book a 30-minute
walkthrough.

Bring three chargers and a sceptical operator. Leave with a sandbox tenant and a price.